Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.



Scroll export button
scopecurrent
template-id0fa09813-8b86-460a-aa1d-ef450a80e9ce
quick-starttrue
add-onScroll PDF Exporter

Info

This guide leads you through the installation of W-AIR Base and W-AIR Base Outdoor and setting up a W-AIR DECT Network in which the bases sync over the air.

Updated: February 2022

Permalink: https://wildix.atlassian.net/wiki/x/SwrOAQ


Info

W-AIR Base is End Of Life.

...

Watch the video tutorial about setting up W-AIR Multicell Network (registration is required):Image Removed

Scroll only inline
https://training.wildix.com/lessons/w-air-networks-main-page/


Noprint


Description

System architecture

...

  1. Go to the WMS menu DevicesW-AIR Networks → click Add
  2. Enter the name Name for your W-AIR Network
  3. Select the gateways from the list on the left and move them to the list on the right

    Warning

    Limitation: it is impossible to register a W-AIR Headset if the code of W-AIR network is different from "0000" (default code). Workaround: temporarily change the code to default one ("0000") , register and assign the Headset(s), and then change it back to custom one.


  4. Click “Save

    Note

    The first base becomes the Main base of the network (M). The gateways make radio sync over the air with each other automatically to extend the work range if possible.




  5. Go back to the Devices Menu, select your base/bases and press “Configure/ Sync device” button


Warning

For CLOUD PBXs, you need to power off the base station and then power it on again (reboot the base station) to apply the new parameters!

Step 3. Register a W-AIR Handset

...

  • The sync chain must always overlap with other Base stations in order to latch each other in sync.

  • Primary base is the one that performs the sync.

  • A maximum of 24 sync levels (Including the primary base) can be used in a deployment.

  • Secondary base stations or repeaters are connected to the Primary base through the synchronisation chain

  • If one of the base or repeater units in the sync chain is broken or not working, then the units that follow the non-working device are cut off from the sync chain, and sync can be lost. In this case, handover between the two clusters is not possible.

...

  • A maximum of 250 base stations can be deployed in one setup (depending on the network requirement not all base stations should be chained).

  • A maximum of 24 sync levels can be used in any deployment.

  • Depending on the system setup, it is recommended to place the Primary base station in the middle of the building and to assign numbers/addresses, radio ID (RPN), etc. to each base station or repeater for easy identification.

    • Continuous line: Shows the primary sync paths, with the relevant bases chained in the multicell network.

    • Dotted line: Alternative sync paths.

...